PTTEP
Map Ta Phut, Rayong province, Thailand
Nov 24
Engineering
The engineering design of wellhead platforms control system upgrade in G1/61 field shall be included existing control system upgrade, change instrument design from pneumatic to Electrical and power system upgrade.