Filter for Project Reference
Industry
Solution
Service
No results found
No projects match the selected filters. Please try adjusting your selections.
Client
GC
Location
Map Ta Phut, Rayong province, Thailand
Completion
Oct 2022 – Sep 2027
Scope
Modification Projects
– Engineering Projects (Feasibility, FEED, Cost Estimation etc.)
Amount of projects 91 Projects
– EPC Projects
Amount of projects 43 Projects
Detail
Projects Area
– Aromatic Plants
– Olefin Plants
– Refinery Plant
– Phenol Plants
More…
Client
PTTEP
Location
Map Ta Phut, Rayong province, Thailand
Completion
Nov 24
Scope
Engineering
Detail
The engineering design of wellhead platforms control system upgrade in G1/61 field shall be included existing control system upgrade, change instrument design from pneumatic to Electrical and power system upgrade.
Client
GC
Location
Map Ta Phut, Rayong province, Thailand
Completion
Jun 24
Scope
FEED + EPC
Detail
– Revamp of existing Oleflex Process Unit by 130% of propylene capacity.
– Process reliability improvement (extend run length of the plant).
– Minimize CAPEX and OPEX at new production rate.
– Major equipment includes Separation System, Refrigeration package, Fired Heater, Reactor Effluent Compressor.
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year
Client
Kuraray GC Advanced Materials Co., Ltd.
Location
Map Ta Phut, Rayong province, Thailand
Completion
2022
Scope
EPC, Commissioning Support
Detail
GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year