Success Solutions

Filter for Project Reference

Industry

Loading...

Solution

Loading...

Service

Loading...

No results found

No projects match the selected filters. Please try adjusting your selections.

Client

GC

Location

Map Ta Phut, Rayong province, Thailand

Completion

Oct 2022 – Sep 2027

Scope

Modification Projects
– Engineering Projects (Feasibility, FEED, Cost Estimation etc.)
Amount of projects 91 Projects
– EPC Projects
Amount of projects 43 Projects

Detail

Projects Area
– Aromatic Plants
– Olefin Plants
– Refinery Plant
– Phenol Plants
More…

Client

PTT

Location

Map Ta Phut, Rayong province, Thailand

Completion

May 20 – August 20

Scope

FEED, +/-10% Cost Estimation, ITB package
and EPC Bid Evaluation and PMC Service.

Detail

Gas Treatment Section
– Mercury Removal Unit
– AGRU (Acid Gas Removal Unit) by Licensor
– Dehydration Unit

Client

AGC Vinythai

Location

Map Ta Phut, Rayong province, Thailand

Completion

Oct 25

Scope

EPC

Detail

– VCM Plant Capacity 400 KTA.
– PVC Plant Capacity 420 KTA.
– Logistic Capacity 407.4 KTA.

Client

PTTEP

Location

Map Ta Phut, Rayong province, Thailand

Completion

Nov 24

Scope

Engineering

Detail

The engineering design of wellhead platforms control system upgrade in G1/61 field shall be included existing control system upgrade, change instrument design from pneumatic to Electrical and power system upgrade.

Client

GC

Location

Map Ta Phut, Rayong province, Thailand

Completion

Jun 24

Scope

FEED + EPC

Detail

– Revamp of existing Oleflex Process Unit by 130% of propylene capacity.
– Process reliability improvement (extend run length of the plant).
– Minimize CAPEX and OPEX at new production rate.
– Major equipment includes Separation System, Refrigeration package, Fired Heater, Reactor Effluent Compressor.

Client

GE VERNOVA

Location

Thailand

Completion

Jun 24

Scope

Critical Machine Maintenance Service

Detail

Major Overhaul Steam Turbine

Client

PTTGSP

Location

Rayong, Thailand

Completion

Jul 24

Scope

Critical Machine Maintenance Service

Detail

Change Gas Turbine Engie

Client

PTT LNG

Location

Rayong, Thailand

Completion

Apr 24

Scope

Tank Maintenance Service

Detail

Overhaul Marine Unloading Arm

Client

GC

Location

Rayong, Thailand

Completion

Mar 24

Scope

Tank Maintenance Service

Detail

Tank Chemical Cleaning

Client

GC

Location

Rayong, Thailand

Completion

Sep 24

Scope

Tank Maintenance Service

Detail

Tank Modification

Client

TTM

Location

Songkhla , Thailand

Completion

Aug 2024

Scope

Fired Heater & Boiler Service

Detail

Column, Drum and Hex Mechanical Services

Client

HMC

Location

Rayong , Thailand

Completion

Jun 2024

Scope

Medium Machine Maintenance Service

Detail

Major Overhaul Extruder & Main Gear

Client

PTTOR

Location

Rayong , Thailand

Completion

Feb 2024

Scope

Medium Machine Maintenance Service

Detail

Major Overhaul Vertical Pump

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Client

Kuraray GC Advanced Materials Co., Ltd.

Location

Map Ta Phut, Rayong province, Thailand

Completion

2022

Scope

EPC, Commissioning Support

Detail

GENESTAR Heat Resistant Polyamide-9T (PA9T) /13,000 tons per year SEPTON Hydrogenated Styrenic Block Copolymers (HSBC)/16,000 tons per year 3-Methyl-1.5-Pentanediol (MPD)/5,000 tons per year

Fill in your information to download

Please fill in your information to receive the PDF file.

Service Download Form